Allplan bridge 20219/11/2023 This expansion in six construction phases includes a seven-span bridge built in 1969 between the Osnabrück Nord and Osnabrück Hafen junctions. Replacement for seven-span bridge from 1969ĭue to the high volume of traffic, the A1 highway between the Ahlhorner Heide interchange and the Lotte/Osnabrück interchange has been widened from four to six lanes for several years. In the Lower Saxony BIM pilot project "Highway A1: Replacement of the bridge over the Hase and the Stichkanal" near Osnabrück, the modeling software was replaced by Allplan Bridge in the middle of the project. This sometimes also involves choosing the right software. As part of the efforts of the federal and state governments to promote digital design and construction, a large number of infrastructure projects are currently being carried out in which the foundations for the application of BIM are being developed. It's about finding out what works and what doesn't. ![]() This is not only one of the most important foundations for success in general, but also one of the core principles of pilot projects. When a BIM pilot project in Lower Saxony became too demanding for their modeling software, THORMÄHLEN + PEUCKERT successfully switched to Allplan Bridge.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |